Shell was involved in the design and construction phase of the plant in Sur which includes the 48" pipeline from the well sites. The pipeline is about 350 kilometres.
From gas discovery in Oman till first LNG cargo in 2000 was about 9 years which was quite fast in those days.
The Dudgeon Offshore Wind Farm is a project to harness offshore wind to power for more than 410,000 UK homes. This 402MW offshore wind farm consisting of 67 wind turbines will be located some 20 miles off the coast of the seaside town of Cromer in North Norfolk, and it is completed and fully commissioned late 2017. Statoil developed the Dudgeon Offshore Wind Farm and will continue as its operator.
Through the joint venture company Dudgeon Offshore Wind Limited, it is owned by Statoil (Equinor), Statkraft and Masdar.
The scope of work was basically fabrication and delivery of the 67 monopiles and 67 transition pieces based on the approved for construction engineering drawings. The transition pieces were subcontracted to a specialised company in Antwerp, Belgium.
Elia is investing in the Belgian high-voltage grid. Via the high-voltage grid, Elia transmits electricity from power generators to consumers like TenneT in the Netherlands
HFG Scope of work was building both jacket and topsite. The jacket was build at Flushing (Vlissingen) and the topsite at HFG yard in Zwijndrecht Netherlands.